DESIGN

FABRICATION

INSTALLATION

STEEL STOCK HOLDER

01275 472 279

Dark Blue Button 150x25
Project Gallery: Hilton Canopy via MJ Patch & Co.
Double Line 900
 

INTERSERVE – BRIZE NORTON 47AD

July 2012 saw the successful completion of the installation of internal AHU platforms, cantilevered service walkways and access staircase’s within the new air dispatch facility at Brize Norton.  M J Patch’s involvement in the project began back in 2010 at the early stages of design with the projects M&E consultants, Architects and Structural Engineers.  This development allowed for the off-site manufacture, assembly and pre-commissioning of 24no CIAT Ozonair units within our warehouse, before being transported and craned into position on site.  The concept allowed for the majority of assembly of all major platforms, walkway sections and staircases at a ground level and away from site, with installation completed within an impressive 16 weeks.

Click for Larger Image
Click for Larger Image
Click for Larger Image
Click for Larger Image
Click for Larger Image
Click for Larger Image

Return to Project Gallery

 
Double Line 900 2
Home | Steel Fabrications | Steel Structures | Sheet Metal | Contact Us | About Us | Services | Industry Sectors | Project Gallery | Eddie Stobart | Arundel Cathedral | Brize Norton | Wiltshire College | Weston College | Castlegate Bristol | Hilton Canopy | Harris & Harris | Bath R.U. Hospital | Chepstow Castle | Uplands Retail | RAF Halton News | Vacancies | Downloads | Cookie Policy

Website by Force 4 Computing Ltd