DESIGN

FABRICATION

INSTALLATION

STEEL STOCK HOLDER

01275 472 279

Dark Blue Button 150x25
Project Gallery: Chepstow Castle via MJ Patch & Co.
Double Line 900
 

CHEPSTOW CASTLE

Working for Ellis Restoration in Spring 2008, M J Patch successfully completed the supply and installation of the steel frame and stainless steel mesh perimeter panels that formed the new roof structure on St Martin’s tower. The project faced challenging elements such as surveying the existing stone structure, production of workshop drawings, access for installation and craning the steelwork to the working area.

Click for Larger Image
Click for Larger Image
Click for Larger Image
Click for Larger Image
Click for Larger Image
Click for Larger Image

Return to Project Gallery

 
Double Line 900 2
Home | Steel Fabrications | Steel Structures | Sheet Metal | Contact Us | About Us | Services | Industry Sectors | Project Gallery | Eddie Stobart | Arundel Cathedral | Brize Norton | Wiltshire College | Weston College | Castlegate Bristol | Hilton Canopy | Harris & Harris | Bath R.U. Hospital | Chepstow Castle | Uplands Retail | RAF Halton News | Vacancies | Downloads | Cookie Policy

Website by Force 4 Computing Ltd